Same span, very different frames
Both buildings below cover the same floor. The difference is how the steel is chosen and where it's made.
- Columns are rolled ISMB/ISMC sections, the same size from base to top
- Roof carried on an angle-section truss fabricated and welded on site
- Section sizes chosen from a catalogue, so most members carry more steel than they need
- Columns and rafters are built up from plate and tapered to follow the actual forces
- Deep at the knee where bending is highest, slim where it isn't
- Cut, welded and drilled in the factory, then bolted together on site
About a quarter less steel for the same building
An Indian study designed the same warehouse both ways to IS 800:2007, IS 875 and IS 1893: 45 m long, 15 m wide, 8.5 m eave height, six 7.5 m bays. The tapered PEB frame came out 26.4% lighter.
For every 1,00,000 kg of steel a conventional building needs, the PEB design in the study needed about 73,600 kg (from 14,718 kg vs 19,999 kg). Less steel also means lighter foundation loads.
Faster because the work runs in parallel
In a conventional shed, fabrication and welding mostly happen on site after the foundations are done. With a PEB, the frame is made in our shop while your foundations are being cast, so the building is ready sooner.
Illustrative sequence, not to scale. Actual durations depend on the building size, design approvals and site readiness.
Everything that changes
| Factor | Conventional shed | ASL pre-engineered building |
|---|---|---|
| Design | Sections picked from standard sizes; truss often by thumb rule | Every member designed for the site's actual loads to IS 800 / IS 875 / IS 1893 |
| Primary frame | Hot-rolled ISMB/ISMC columns, uniform along their length | Built-up tapered I-sections, deep where forces are high and slim where they're low |
| Roof structure | Angle truss with many small members and joints | Clean rigid portal frame with no truss, so more usable height under the roof |
| Steel used | Baseline | 21–26% less for the same building in an IS-code comparative study |
| Where it's made | Mostly cut and welded on site | Cut, welded, drilled and painted in our shop |
| Connections | Site welding, quality depends on the welder and weather | Factory-drilled bolted joints, repeatable and checkable |
| Quality control | Hard to inspect welds done at height | Material test certificates and inspection before dispatch |
| Site scrap | Cutting on site leaves offcuts and scrap to clear | Members arrive cut to length, so little scrap on site |
| Foundations | Often oversized because loads are estimated | Sized from exact column reactions issued with the drawings |
| Clear span | Truss depth and weight grow quickly as the span increases | Clear-span portal frames with no truss; very wide buildings use multi-span frames |
| Speed | Fabrication waits for foundations; long site work | Fabrication runs parallel with civil work; erection in weeks |
| Cranes | Crane girders added on, often as an afterthought | Crane brackets and runway designed into the frame |
| Future expansion | Costly structural changes | Add bays along the length or a lean-to on the side |
| Maintenance | Many truss joints and site welds to inspect and repaint | Fewer, factory-painted members; lower upkeep over the building's life |
Four reasons a PEB costs less to own
Steel follows the forces
Bending in a portal frame is highest at the knee and lowest near the ridge. Tapering the section to match means you don't pay for steel that isn't working.
Lighter frame, smaller footings
A lighter structure and exact column reactions let your civil engineer size foundations precisely instead of playing safe with extra concrete.
Factory work, not site work
Cutting, welding and painting in the shop cuts site labour, scrap and rework. The site crew mostly lifts and bolts.
Production starts sooner
Fabrication happens while foundations cure, so the building is ready weeks earlier. Every month saved is a month of rent, storage or output earned.
What buyers ask before switching
Is a lighter PEB frame weaker than a heavy conventional one?
PEB rates per kg are higher. Isn't it more expensive?
Can a PEB carry an EOT crane?
How long does a PEB last?
Want to see the difference for your plot? Send us the size and we'll quote it as a PEB.
Get a PEB quote →Source for the steel comparison: IJERT comparative study (45 × 15 m warehouse, IS 800 / IS 875 / IS 1893). Your building will be designed and priced on its own loads.